期刊文献+

广德站维修机构布局优化方案研究

A Study on the Optimization of the Maintenance Facilities Distribution in Guangde Station
下载PDF
导出
摘要 广德站维修机构采用分专业独立设置,为使广德站维修机构由传统分专业维修模式逐步向集中化、协同化的综合维修模式转变。在分析广德站既有维修机构布局现状的基础上,结合广德站实际情况,通过分析既有布局存在问题,提出广德站综合维修机构布局优化、广德站综合维修基地布置方案,实现生活保障管理一体化和必要的生产设施共享,充分利用既有设备设施,实现生产生活设施与综合维修模式相适应,为既有线改建过程中综合维修机构设置提供借鉴。 The maintenance facilities in Guangde Station are distributed independently according to different systems,and it is necessary to change from this traditional mode to a more integrated and coordinated mode.This paper first presents the existing distribution of the facilities in Guangde Station and analyzes the problems of the existing situation.Then,the plan for optimization and the layout of Guangde Integrated Maintenance Center are proposed with the purpose of integrating the living service and management as well as sharing the necessary facilities.The existing facilities are fully used,and the living supporting facilities are matching with the integrated maintenance mode.This study could be a reference to the maintenance facilities distribution for existing line reconstruction projects.
作者 王宁 WANG Ning(Line&Station Institute,Jinzhou Railway Survey and Design Institute Co.,Ltd,Jinzhou 121000,Liaoning,China)
出处 《铁道运输与经济》 北大核心 2020年第1期91-95,共5页 Railway Transport and Economy
基金 锦州铁道勘察设计院有限公司科研项目(KY-2018-30)
关键词 既有铁路 广德站 维修机构 综合维修 专业维修 维修基地 优化 Existing Railway Guangde Station Maintenance Facilities Integrated Maintenance Specialized Maintenance Maintenance Center Optimization
  • 相关文献

参考文献5

二级参考文献28

  • 1陈萍,黄信基.建立客运专线综合维修体系的探讨[J].中国铁路,2005(9):27-28. 被引量:6
  • 2铁建设函[2005] 285号,新建时速200 km客货共线铁路设计暂行规定[S].北京:中国铁道出版社,2005.
  • 3TB10621-2009,高速铁路设计规范(试行)[S].北京:中国铁道出版社,2010.
  • 4铁运[2009] 36号,关于客运专线固定设施维修管理有关问题的指导意见[S].
  • 5白旭东.铁路基础设施综合检测及管理.世界轨道交通技术与装备,2009,(1):48-49.
  • 6Garg A, Deshmukh S G. Maintenance Management:Literature Review and Directions[J]. Journal of Quality inMaintenance Engineering,2006,12(3): 205-238.
  • 7祁杰生,艾柱,肖兴,等.高速铁路信号维护规则(试行)[M].北京:中国铁道出版社,2013.
  • 8Egan G T, Dillon T S, Morsztyn K. An ExperimentalMethod of Determination of Optimal Maintenance Schedulesin Power Systems Using the Branch and Bound Technique[J] .IEEE Transactions on Man and Cybernetics, 1976,6(8):538-547.
  • 9Lim BO, Yu Y H. A Study of the Reliability CenteredMaintenance (RCM) for the Korea Train eXpress(KTX)Vehicle[EB/OL]. [2015-10-20]. http://www.uic.org/cdrom/2006/wcrr2006/pdf/233 .pdf.
  • 10Sharma R K, Kumar D, Kumar P. FLM to Select SuitableMaintenance Strategy in Process Industries Using MISOModel[J]. Journal of Quality in Maintenance Engineering,2005, 11(4): 359-374.

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部