摘要
阐述我国第一座72 MVA电炉首次停炉大修炉衬损耗情况、筑炉技术,为同类红土矿镍铁冶炼电炉的大修改造提供参考。
The lining loss and furnace building technology of the first 72 MVA electric furnace in our country during the first shutdown and overhaul are described,which provides reference for the overhaul and reconstruction of the same laterite nickel iron smelting furnace.
出处
《有色设备》
2019年第6期55-59,共5页
Nonferrous Metallurgical Equipment
关键词
镍铁电炉
矩形
红土矿
筑炉技术
镁砖
ferronickel furnace
rectangle
laterite
furnace building technology
magnesia brick