摘要
分析了5000m^3拱顶储罐倒装法与外脚手架正装法拆除的施工工艺流程、经济效益、工期要求及安全防护方面的优缺点,得出倒装法拆除在5000m^3拱顶储罐的拆除中更具优势。
This paper analyzes the advantages and disadvantages of the construction process,economic benefits,construction period requirements and safety protection in the demolition of 5000 m^3 dome roof storage tank by the method of inverted installation and the method of front installation of external scaffold,It is concluded that the inverted demolition method has more advantages in the demolition of 5000 m^3 dome roof storage tank.
作者
董洪军
杜卓
Dong Hongjun;Du Zhuo(CNPC Lanzhou Petrochemical Company Construction Company,Gansu Lanzhou 730060)
出处
《石化技术》
CAS
2019年第12期8-9,共2页
Petrochemical Industry Technology
关键词
拱顶储罐
倒装法拆除
外脚手架正装法拆除
对比
Vault storage tank
Removal by reverse installation
Removal of external scaffold by positive installation
Contrast