基于工程地质风险的合同调差机制研究

Research on contract adjustment mechanism based on engineering geological risk
下载PDF
导出
摘要 工程地质条件对地下工程项目工期和成本起主导性作用,参与工程项目的承包商研究项目地质风险管理具有重要意义。鉴于此,笔者基于地下工程项目,引入进度偏差概念,量化工程地质风险,确定了工程地质风险的三个评价指标,并建立了相匹配的合同调差机制,承包商和业主可用其划分工期调差权利,分割及量化地质风险归属。通过国外工程案例实证分析,工程地质风险可以通过合同调差机制进行分割、量化及分摊。 Geological conditions play a leading role in the duration and cost of underground projects.It is of great significance for contractors involved to study geological risk management.In view of this,based on underground projects,the author introduces the concept of schedule deviation,quantification of the engineering geological risk,determination of three evaluation indicators of engineering geological risk and the establishment of matching contract adjustment mechanism.Contractors and owners can take advantage of it to divide the right of schedule adjustment,to divide and quantify the attribution of geolog ical risk.By empirical analysis of foreign project cases,engineering geological risk can be divided,quan tified and allocated through contract adjustment mechanism.
作者 陈雷 许伟 马志勇 CHEN Lei;XU Wei;MA Zhiyong(PowerChina Huadong Engineering Corporation Limited)
出处 《大坝与安全》 2019年第6期26-30,共5页 Dam & Safety
关键词 地质风险 偏差 基本参数 合同机制 调差 geological risk variation basic parameters contract mechanism adjustment
  • 相关文献

参考文献6

共引文献269

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部