摘要
基于数值模拟,对沈阳地铁九号线奥体中心站及奥-奥区间近接沈阳地铁二号线既有车站施工进行全过程模拟分析,分析了不同区域施工对既有车站产生的影响,寻找施工过程中的控制点,确保工程顺利安全进行。
Based on the numerical simulation,the simulation analysis on the whole process of the construction of the Olympic Sports Center Station of Shenyang Metro Line 9 and the range of Olympic Sports Center to Olympic Sports Center close to the existing station of Shenyang Metro Line 2 is made,the influence of the construction in different areas on the existing station is analyzed,and the control points in the construction process are found to ensure the smoothness and safety of the project.
作者
朱峰
ZHU Feng(Liaoning Provincial Communications Planning and Design Institute Co.,Ltd.,Shenyang 110166,China)
出处
《北方交通》
2020年第1期80-84,共5页
Northern Communications
关键词
地铁施工
近接既有车站
数值模拟
全过程分析
Metro construction
Close to the existing station
Numerical simulation
Whole process analysis