摘要 基于数值模拟,对沈阳地铁九号线奥体中心站及奥-奥区间近接沈阳地铁二号线既有车站施工进行全过程模拟分析,分析了不同区域施工对既有车站产生的影响,寻找施工过程中的控制点,确保工程顺利安全进行。 Based on the numerical simulation,the simulation analysis on the whole process of the construction of the Olympic Sports Center Station of Shenyang Metro Line 9 and the range of Olympic Sports Center to Olympic Sports Center close to the existing station of Shenyang Metro Line 2 is made,the influence of the construction in different areas on the existing station is analyzed,and the control points in the construction process are found to ensure the smoothness and safety of the project.
作者 朱峰 ZHU Feng(Liaoning Provincial Communications Planning and Design Institute Co.,Ltd.,Shenyang 110166,China)
出处 《北方交通》 2020年第1期80-84,共5页 Northern Communications
关键词 地铁施工 近接既有车站 数值模拟 全过程分析 Metro construction Close to the existing station Numerical simulation Whole process analysis
  • 相关文献

参考文献3

二级参考文献18

共引文献7

同被引文献22

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部