期刊文献+

全长锚注支护技术在断层破碎区的应用 被引量:1

Application of Full-length Bolt-grouting Support Technology in Fractured Fault Zone
下载PDF
导出
摘要 为了保证8303辅运巷过断层期间顶板稳定,提高巷道过断层的掘进效率,分析了断层带围岩力学参数,提出了全长锚注支护技术,巷道在0~25d范围内围岩变形逐渐降低,在25d后顶底板、巷帮变形趋于稳定,顶板最大下沉量控制在0.24m以下,巷帮最大移近量控制在0.29m以下,与巷道完整阶段变形量相差不大,具有显著应用成效。 In order to ensure the stability of the roof and improve the tunneling efficiency of the 8303 auxiliary haulage roadway during passing through the fault,the mechanical parameters of the surrounding rock in the fault zone are analyzed,and the full-length bolt grouting support technology is proposed.The deformation of the surrounding rock in the 0~25d range of the roadway is gradually reduced.After 25d,the deformation of the roof and floor and the roadway side tends to be stable,the maximum subsidence of the roof is controlled below 0.24m,and the maximum displacement of the roadway side is controlled at 0.29m in the following,there is no significant difference between the deformation in the complete stage of the roadway and it has significant application effect.
作者 吴春 Wu Chun(Shanxi Hongyu Chengzhu Engineering Construction Co.Ltd.,Shanxi Shuozhou 038300)
出处 《山东煤炭科技》 2020年第2期37-39,共3页 Shandong Coal Science and Technology
关键词 巷道 断层 锚注 支护 roadway fault bolt-grouting support
  • 相关文献

参考文献5

二级参考文献34

共引文献72

同被引文献4

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部