摘要
本文设计了云冈矿8623工作面切眼贯通方案,并计算分析误差预计。结果表明,纵、横坐标增量闭合差分别为fx=0.140m、fy=0.116m,符合有关规程规定贯通允许误差为±0.3m的要求,设计合理,为保障该工作面的正常开采提供了基础。
In this paper,the scheme of cut through in 8623 face of Yungang Mine is designed,and the error prediction is calculated.The results show that the incremental closure errors of the vertical and horizontal coordinates are fx=0.140m and fy=0.116m respectively,which meet the requirements of the relevant regulations that the allowable through error is±0.3m.The design is reasonable,which provides the basis for the normal mining of the working face.
作者
祖丽荣
Zu Li-rong(Yungang Coal Mine,Datong Coal Mine Group,Shanxi Datong 037017)
出处
《山东煤炭科技》
2020年第2期193-195,共3页
Shandong Coal Science and Technology
关键词
切眼贯通
贯通误差
贯通测量
误差预计
cut transfixion
transfixion error
transfixion survey
error prediction