挖金湾矿8102工作面沿空掘巷煤柱尺寸优化及支护研究 被引量:7

Study on dimension optimization and support of coal pillar in digging roadway along gob in 8102 working face of Wajinwan mine
下载PDF
导出
摘要 挖金湾煤矿正在进行8#煤层的采掘活动,为提高资源利用率设计应用留小煤柱沿空留巷技术,以8102工作面回采巷道的布置及支护为工程背景,通过理论分析、数值模拟及现场监测研究确定合理的煤柱宽度为14m,设计8102运输顺槽采用“锚网索”支护的具体参数,应用后进行围岩位移情况的监测,8102运输顺槽掘进期间顶板下沉量最大为32mm,底板底鼓量最大为60mm,实体煤侧最大变形量为65mm,煤柱侧最大变形量为85mm,围岩变形得到了有效的控制,所确定的煤柱宽度和支护方式取得了良好的应用效果。 Dig in jinwan is 8#coal seam in coal mine mining activities,to improve the utilization rate of resources application design for a small coal pillar along the technology,with 8102 working face of mining roadway layout and support for the engineering background,through theoretical analysis,numerical simulation and field monitoring studies to determine the reasonable width of coal pillar is 14 m,8102 transport gateway design adopts"the anchor net supporting"specific parameters,application of monitoring the situation of the displacement of surrounding rock after 8102 transport gateway roof subsidence during drivage 32 mm,maximum amount of drum at the bottom of the base plate up to 60 mm,the entity coal side maximum deformation is 65 mm,The maximum deformation of coal pillar side is 85mm,and the surrounding rock deformation is effectively controlled.
作者 杨海峰 YANG Haifeng(Datong coal mining group Wajinwan Coal Co.,Ltd.,Datong037042,China)
出处 《煤矿现代化》 2020年第2期27-29,共3页 Coal Mine Modernization
关键词 坚硬直接顶:运输顺槽 数值模拟:沿空掘巷 Hard direct top:transport along the trough numerical simulation:along the empty roadway:
  • 相关文献

参考文献3

二级参考文献15

共引文献2

同被引文献37

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部