期刊文献+

新区段通风系统形成过程中避免串联通风解决方案研究

Study on avoiding series ventilation solution during formation of new section ventilation system
下载PDF
导出
摘要 济宁二号煤矿在11采区边角煤B11301工作面通风系统形成过程中,采用了全风压与局部通风相结合的混合式通风方法,避免了形成串联通风,取得了较好的效果,具有一定的推广价值。 In the formation process of the ventilation system of the B11301 working face of the side angle coal in the 11 mining area,Jining No.two coal mine adopts a mixed ventilation method combining all wind pressure and local ventilation,which avoids the formation of series ventilation.It has achieved good results and has a certain popularization value.
作者 宋兆雪 郭英 姜希印 SONG Zhaoxue;GUO Ying;JIANG Xiyin(Yanzhou Coal Mining Co.Ventilation department,Shandong Zouchen 273500;Yanzhou Mining Group Security Supervision Bureau,Shandong Zoucheng 273500;No.2 coal mine in Jining,Yanzhou Coal Mining Co,Shandong Jining 272072)
出处 《煤矿现代化》 2020年第2期72-73,76,共3页 Coal Mine Modernization
关键词 通风系统 全风压通风 混合式通风 Ventilation system Full air pressure ventilation Mixed ventilation
  • 相关文献

参考文献2

二级参考文献4

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部