期刊文献+

万家口子水电站碾压混凝土双曲拱坝排水系统设计

Design of Drainage System for RCC Double Curvature Arch Dam of Wanjiakouzi Hydropower Station
下载PDF
导出
摘要 云南万家口子碾压混凝土双曲拱坝排水系统由坝体排水、坝基坝肩排水和两岸抗力体排水组成。笔者简略介绍大坝坝体排水、坝基坝肩排水和两岸抗力体排水设计方案。从电站运行后实际渗水情况来看,大坝排水系统设计是合理有效的。 The drainage system of Wanjiakouzi RCC double curvature arch dam in Yunnan Province consists of dam body drainage,dam foundation abutment drainage and resistance body drainage on both banks.This paper briefly introduces the design scheme of dam body drainage,dam foundation abutment drainage and resistance body drainage on both banks.According to the actual seepage situation after the operation of the power station,the design of the dam drainage system is reasonable and effective.
作者 伍杰添 盘春军 熊图耀 WU Jietian;PAN Chunjun;XIONG Tuyao(China Energy Engineering Group Guangxi Electric Power Design Institute Co.Ltd.,Nanning Guangxi 530007)
出处 《红水河》 2020年第1期52-54,60,共4页 Hongshui River
关键词 碾压混凝土 双曲拱坝 排水系统 设计 万家口子水电站 roller compacted concrete double curvature arch dam drainage system design Wanjiakouzi Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部