笔者介绍了万家口子水电站高拱坝施工布置的基本思路及结合现场采取优化布置。通过一系列施工优化,促进了大坝快速优质施工,顺利实现了大坝下闸蓄水目标。
This paper introduces the basic idea of the construction layout of the high arch dam of Wanjiakouzi Hydropower Station and the optimized layout combined with the site.Through a series of construction optimization,the rapid and high-quality construction of the dam is promoted,and the goal of dam impoundment is successfully realized.
作者
卢山
LU Shan(China Energy Engineering Group Guangxi Hydroelectric Construction Bureau Co.Ltd.,Nanning Guangxi 530001)
出处
《红水河》
2020年第1期86-89,共4页
Hongshui River
关键词
万家口子水电站
双曲拱坝
碾压混凝土
优化
快速施工
Wanjiakouzi Hydropower Station
double curvature arch dam
roller compacted concrete
optimization
rapid construction