摘要
针对目前隧洞施工环保、施工安全等要求的提高,介绍了毗河工程中采用掘进机和传统爆破施工方式具有的优缺点以及采取的有效措施。
Aiming at the current situation of improving the requirements of environmental protection and construction safety in tunnel construction.This paper introduces the advantages and disadvantages of the tunneling machine and the traditional blasting construction method used in the Pihe Project,as well as the effective measures taken.
作者
胡洪鑫
刘金平
刘毓川
HU Hongxin;LIU Jinping;LIU Yuchuan(Sinohydro Bureau 10 Co.,Ltd,Dujiangyan,Sichuan,611830)
出处
《四川水力发电》
2020年第1期54-58,共5页
Sichuan Hydropower
关键词
机械开挖
现场施工
优缺点
毗河供水一期工程
mechanical excavation
site construction