水淹厂房是抽水蓄能电站主要风险之一,一旦发生水淹厂房事故,有可能造成重大的经济损失和人员伤亡。目前,国内抽水蓄能电站建设及运行单位非常重视电站的水淹厂房防范措施。本文从水机专业设计角度,对抽水蓄能电站在防水淹厂房设计上应注意的地方进行研究和探讨,并提出一些可行的建议。
The flooding of Powerhouse is one of the main risks in pumped-storage power station,The accident of Powerhouse being flooded may lead to heavy economic losses and casualties.At present,the construction and operation organizations of pumped-storage power station attach great importanee to the preventive measures against the powerhouse being flooded.This article will research and discuss what should be paid attention to prevent the power station being flooded in the view of professional hydraulic machinery design.Meanwhile,some feasible suggestions will be given.
作者
张旭
陈鑫
陈昕
ZHANG Xu;CHEN Xin;CHEN Xin(Changjiang Engineering Survey,Planning,Design and Research Co.Ltd.,Wuhan 430010,China;Power China ZhongNan Engineering Co.Ltd.,Changsha 410014,China)
出处
《水电与抽水蓄能》
2019年第6期75-77,共3页
Hydropower and Pumped Storage
关键词
抽水蓄能电站
水淹厂房
水力机械
进水球阀
pumped-storage power station
flooding of powerhouse
hydraulic machinery
inlet ball valve