摘要
As one of the strategic channels of natural gas import in China,the Eastern Line of Sino-Russian Natural Gas Pipeline(hereinafter referred to as the"Sino-Russian East Line")began construction in June 2015 after 20 years of negotiation.At the end of July 2019,the Chinese domestic section was successfully connected with the Russian"Power of Siberia"pipeline.