摘要
南水北调东线一期工程利用京杭运河韩庄运河段现有河槽输水,航运船闸用水对本段输水损失影响较大。通过调查泵站及船闸运行情况,分析了航运船闸用水对韩庄运河段南水北调泵站调水调度的影响,分析结论对南水北调东线结合航运调水调度工作有参考意义。
The East Route of South-to-North Water Diversion Project(Phase I)uses existing channels of Hanzhuang Canal Section of Beijing-Hangzhou Grand Canal to deliver water.Water used for navigation lock can greatly influence water con veyance losses of this section.This paper investigates operation situations of the pumping station and the navigation lock and analyzes the influence of the water used for navigation lock on water diversion scheduling of Hanzhuang Canal Section of South-to-North Water Diversion Project.Conclusions of this paper can provide some reference for water diversion sche-duling of the East Route of South-to-North Water Diversion Project.
作者
刘宗柏
吕晓理
吕鸿翔
LIU Zong-bai;LV Xiao-li;LV Hong-xiang(ShanDong Main Route Co.,Ltd.of East Route of South to North Water Diversion Project,Jinan 250109,China)
出处
《海河水利》
2020年第1期5-7,共3页
Haihe Water Resources
关键词
南水北调
韩庄运河段
调水调度
航运用水
输水损失
South to North Water Diversion Project
Hanzhuang canal section
water transfer operation
shipping water
water loss