摘要 半自磨机在生产过程中会产生大量顽石,顽石在磨机内累积会影响磨机的产能及磨矿单位功耗。通过分析某铜矿半自磨机3个月的生产数据,研究给料粒度分布及磨机转速对顽石产率的影响,总结出如下规律:半自磨机给料粒度的稳定性和配比对顽石产率均有影响,当半自磨机给料粒度稳定,粒度分布合理,特别是超大粒度矿石分布合理时,半自磨机顽石产率高;半自磨机转速与顽石产率呈正相关,半自磨转速增大,加快了磨机的排矿能力,顽石产率高。针对此种规律,给出了现场半自磨机调节建议。 During the operation of SAG mill,a large number of pebbles produced.The pebbles cumulated inside the mill affected the yield and the specific power consumption of the mill.After analyzing the production data of the SAG mill in a copper mine over three months,the paper researched the influence of the feed particle size distribution and the mill speed on the pebble yield,and concluded the laws as below:both the stability and the proportion of the particle size of the SAG feed affected the pebble yield.While the particle size of SAG mill feed was stable and the particle size distribution was reasonable,especially that of oversize ores distributed reasonably,the pebble yield of SAG mill was high.The speed of SAG mill positively related with the pebble yield.While the speed of SAG mill increased,its throughput enhanced,the pebble yield rose.In response to the above laws,the suggestions about the adjustment of SAG mill were offered.
作者 谭文才 夏林 刘俊 田振华 杜自彬 张树辉 TAN Wencai;XIA Lin;LIU Jun;TIAN Zhenhua;DU Zibin;ZHANG Shuhui(Luoyang Mining Machinery Engineering Design Institute Co.,Ltd.,Luoyang 471039,Henan,China;State Key Laboratory of Mining Heavy Equipment,Luoyang 471039,Henan,China;Zijinshan Gold&Copper Mine,Zijin Mining Group Co.,Ltd.,Shanghang 364200,Fujian,China;CITICHIC Engineering&Technology Co.,Ltd.,Luoyang 471039,Henan,China)
出处 《矿山机械》 2020年第1期40-44,共5页 Mining & Processing Equipment
关键词 半自磨机 顽石产率 粒度分布 磨机转速 SAG mill pebble yield distribution of particle size mill speed
  • 相关文献

参考文献4

二级参考文献41

  • 1夏菊芳.半自磨工艺在我国矿山的应用现状[J].中国矿山工程,2004,33(5):37-39. 被引量:33
  • 2赵昱东.自磨(半自磨)机在金属矿山的应用与发展[J].矿业快报,2005,21(4):1-5. 被引量:11
  • 3许伟,周德先,唐新民,吴照银.冬瓜山铜选厂半自磨机试生产的研究[J].矿山机械,2007,35(4):34-38. 被引量:5
  • 4Mark Sherman. Bond is Back [A]. SAG2011 Vancouver, Canada.
  • 5张卯均,胡为柏,邵全渝,等.选矿手册第二卷第一分册[M].北京:冶金工业出版社,1993:261-262.
  • 6S. Morrell. A method for predicting the specific energy requirement of comminution circuits and assessing their energy utilisation effi- ciency. Minerals Engineering [J]. 2008(21): 1 137-1 146.
  • 7S.Morrell. Design of AG/SAG Mill Circuit Using the SMC Test [A]. SAG2006 Vancouver, Canada.
  • 8S.Hart, T.Rees, S.Tavani, etc. Process Integration and Optimi- sation of the Boddington HPGR circuit [A]. SAG2011 Vancou- ver, Canada.
  • 9Ben Burger. Luis Vargas. Hamer Arevalo, etc. Yanacocha Gold Single Stage SAG Mill Design Operation and Optimization [A]. SAG2011 Vancouver, Canada.
  • 10Stuart M.Jones,Jr,Moris Fresko. Autogenous and Semiautogenous Mills 2010 Update[A].Canada:Vancouver,2011.1-24.

共引文献32

同被引文献2

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部