摘要
为实现徐州地铁2号线九里山站基坑工程开挖的信息化管理与三维可视化,进行Revit软件二次开发,结合3DMAX技术、基坑监测技术和物联网技术,建立了BIM信息化系统。基于监测数据与BIM模型,对基坑的稳定性进行实时计算与评估,为基坑工程的安全开挖提供技术保障。
In order to realize the information management and 3 D visualization of the excavation of the Jiulishan Station of Xuzhou Metro Line 2, with the secondary development of Revit software, BIM information technology system was established with 3 DMAX technology, foundation pit monitoring technology and the Internet of Things technology. Based on the monitoring data and BIM model, the stability of the foundation pit is calculated and evaluated in real time to provide technical support for the safe excavation of the foundation pit project.