摘要
针对新建专用线引起的通信机房搬迁工程,结合铁路通信线路、设备及信号楼的实际情况,对通信机房搬迁过程中可能出现的各种问题进行讨论,为以后类似工程提供经验。
In view of the relocation project of communication room caused by the new special line,combined with the actual situation of railway communication lines,equipment and signal building,this paper discusses various problems that may occur in the process of relocation of communication room,and provides experience for similar projects in the future.
作者
贾高飞
JIA Gao-fei(China Railway Electrification(Wuhan)Design&Research Institute Co.,Ltd.,Wuhan 430074,China)
出处
《通信电源技术》
2020年第3期266-267,269,共3页
Telecom Power Technology
关键词
专用线
机房搬迁
铁路通信
special line
machine room relocation
railway communication