梨园水电站进水口检修闸门拉杆穿销平台方案设计 被引量:2

Design of Pull Rod through Pin Platform for Intake Bulkhead Gate of Liyuan Hydropower Station
下载PDF
导出
摘要 根据现场布置及实测数据,采用头脑风暴法提出满足实际的设计要求,利用Solidworks完成结构设计、ANSYS完成强度验算,完成方案设计。该方案将彻底解决闸门拉杆连接过程中人员高处坠落、设备滑落的安全风险,提高闸门起吊的工作效率。 According to the field layout and measured data,bramstorming method is adopted to meet the actual design requirements.Solidworks is used to complete the structural design,and ANSYS is used to complete the strength checking calculation.This scheme will thoroughly solve the safety risk of personnel falling and equipment sliding during the connecting process of gate tie rod,and improve the efficiency of gate lifting.
作者 张建国 骆科军 ZHANG Jian-guo;LUO Ke-jun(Liyuan power generation branch of Yunnan Huadian Jinsha River middle reaches Hydropower Development Co.,Ltd,Lijiang 674100,China)
出处 《云南水力发电》 2020年第1期107-109,共3页 Yunnan Water Power
关键词 水电站 闸门 穿销平台 结构设计 hydropower station sluice gate pin-through platform structural design
  • 相关文献

参考文献3

二级参考文献7

共引文献8

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部