摘要
新疆某电站位于新疆北疆地区,地震基本烈度为Ⅷ度,发电厂为岸边式地面厂房,由主厂房、副厂房及尾水建筑物等组成。通过主厂房刚度计算机整体稳定的计算分析,在满足机电设备布置等要求的前提下,合理的确定各部位的尺寸及空间,使厂房布置实现安全、经济的目的。
A power station is located in the northern Xinjiang region,with the basic earthquake intensity of VUI degree.The power plant is a shore-type ground-based powerhouse,which consists of the main powerhouse,auxiliary power house and tailrace building.Based on the calculation and analysis of overall stability of stiffiiess computer of the main power house,the size and space of each part are determined reasonably.So that the plant layout can achieve the purpose of safety and economy.
作者
熊伟
XIONG Wei(Xinjiang Institute of Water Conservancy and hydropower survey and design,Urumqi 830000,China)
出处
《云南水力发电》
2020年第1期138-141,共4页
Yunnan Water Power
关键词
厂房
布置
刚度
稳定
水电站
powerhouse
layout
stiffiiess
stability
hydropower station