基于双时间窗的多设备串行系统机会维护策略 被引量:7

Opportunistic Maintenance Strategy for Multi-Unit Serial Systems Based on Dual Time Window
下载PDF
导出
摘要 针对多设备串行系统,提出一种基于双时间窗策略的机会维护决策模型,改变传统单窗策略中以达到单设备最优维护周期为系统停机条件这一决策方式,转而以此作为维护决策触发条件,进而基于维护组合时间窗确定最佳的维护设备组合,并引入维护时机时间窗优化系统的维护停机时刻.在此基础上,通过最小化系统在规划期内的维护总成本,获取系统的最优维护策略.算例分析表明,双窗策略在维护总成本方面优于单窗策略. A decision model of opportunistic maintenance based on dual time window strategy is proposed for the multi-unit serial system. Instead of taking the arrival of a single unit’s optimal maintenance interval as the system shutdown condition in traditional single window strategy, dual time window strategy takes it as the trigger condition in maintenance decision. It decides the best maintenance equipment combination based on the maintenance time window for unit grouping, and introduces a new maintenance time window for preventive maintenance implementation to optimize the system downtime. On the basis of dual time window, the optimal maintenance strategy of the system is obtained by minimizing total maintenance cost of the system during the planning period. The example analysis shows that the dual window strategy is better than the single window strategy on total maintenance cost.
作者 俞梦琦 史凯龙 周晓军 YU Mengqi;SHI Kailong;ZHOU Xiaojun(School of Mechanical Engineering,Shanghai Jiao Tong University,Shanghai 200240,China)
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2020年第1期69-75,共7页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(51575356)
关键词 多设备串行系统 预防维护 机会维护 维护成本 维护时间窗 multi-unit serial system preventive maintenance opportunistic maintenance maintenance cost maintenance time window
  • 相关文献

参考文献5

二级参考文献57

  • 1奚立峰,周晓军,李杰.有限区间内设备顺序预防性维护策略研究[J].计算机集成制造系统,2005,11(10):1465-1468. 被引量:20
  • 2SHEU S H,GRIFFITH W S.Extended block replacement policy with shock models and used items[J].European Journal of Operational Research,2002,140(1):50-60.
  • 3WANG H Z,PHAM H.Availability and maintenance of series systems subject to imperfect repair and correlated failure and repair[J].European Journal of Operational Research,2006.174(3);l706-1722.
  • 4VAURIO J K.Optimization of test and maintenance intervals based on risk and cost[J],Reliability Engineering and System Safety,1995,49(1):23-36.
  • 5ANISIMOV V V,GURLER U.An approximate analytical method of analysis of a threshold maintenance policy for a multiphase multi-component model[J].Cybernetics and Systems Analysis,2003,39(3):325-337.
  • 6OKOGBAA O G,OTIENO W,PENG X,et al.Transient analysis of maintenance intervention of continuous multi-unit systems[J].HE Transactions,2008,40(10):971-983.
  • 7LAI M T,CHEN Y C.Optimal replacement period of a two-unit system with failure rate interaction and external shocks[J],International Journal of Systems Science,2008,39(1):71-79.
  • 8ZHOU X J,XI L F,LEE J.Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation[J].Reliability Engineering and System Safety,2007,92(4):530-534.
  • 9JOSHI D R, JANGAMSHETTI S H. A novel method to estimate the O&M costs for the financial planning of the wind power projects based on wind speed: A case study [J]. IEEE Transactions on Energy Conversion, 2010, 25(1): 161-167.
  • 10WALLACE J J, DAWSON M. O&M strategies: Wind turbine blades[J]. Reliability Energy Focus, 2009, 10(3): 36-41.

共引文献90

同被引文献38

引证文献7

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部