摘要
政府投资项目具有规模大、工程技术难度高、项目周期长的特点,在实际施工中易出现超概算问题。基于此,以政府投资项目为背景,围绕超概算现象展开探讨,分析其主客观原因,并提出控制措施。
The government investment projects have the characteristics of large scale,high engineering technology difficulty and long project cycle,which are easy to exceed the budget in actual construction.Based on this,taking the government investment project as the background,this paper discusses the exceed budget estimates phenomenon,analyzes its subjective and objective reasons,and puts forward control measures.