本文通过对施工空间受限、大板块全玻璃幕墙施工技术的深入研究,提出一种新的超大、超重玻璃的吊装安装技术:“一推、二拉、三提升法”进行。这优化了超大板块玻璃安装施工工艺,解决了施工过程中的技术难点,为同类工程的施工提供了借鉴和参考。
Through the deep research on the construction technology of all-glass curtain wall of large plate with limited construction space,this paper puts forward a lifting and installation technology of super heavy glass with“one push,two pull and three lift”method,which could optimize the installation technology of super plate glass,solves the technical difficulties in the construction process,and provides reference for the construction of similar projects.
作者
罗卫军
Luo Weijun(Guangdong Century Construction Group Co.,Ltd.,Foshan,528251,Guangdong)
出处
《建设科技》
2020年第3期100-104,共5页
Construction Science and Technology
关键词
大板块
无肋全玻璃幕墙
large plate
glass curtain wall without ribs