摘要
大藤峡水利枢纽土石方、混凝土、金属结构工程量巨大,且交叉干扰多,安装、调试难度极大,因此做好施工组织设计是确保工程顺利实施的关键环节。根据大藤峡水利枢纽主要施工、交通条件情况,对料场选择、施工总布置、施工导流、主体工程施工方法及施工总进度进行了设计,使整个布局合理,便于施工。
Due to the large quantity of cubic meter of earth and stone,concrete,metal structures and cross interference involved in the Datengxia Project,it is difficult to complete installation and trial operation without sound organization and delicate design.Therefore,under the principle of applying rational layout and convenience for construction,decisions are made for stock ground selection,general layout of construction,diversion,methods of main works construction and total progress,by taking the construction and transport conditions into consideration.