摘要
随着我国社会经济与科学技术的不断进步,我国海洋石油工程建设得到快速发展。采购作为海洋石油工程建设的重要组成部分,其具有采购品类繁多、采购过程复杂等特点,对海洋石油工程建设项目进度控制和管理有着极高的影响。文章从几个方面就海洋石油工程建设项目采购存在的问题进行深入分析,并提出加强海洋石油工程建设项目采购进度策略,提升工程质量、降低项目成本。
With the continuous progress of China’s social economy and science and technology,China’s offshore petroleum engineering has been developing rapidly.Procurement as an important part of offshore oil engineering construction,It has the characteristics of various procurement categories and complicated procurement process,It has a great influence on the progress control and management of offshore oil engineering construction projects.This paper analyzes the problems existing in the procurement of offshore oil construction projects from several aspects,And proposed to strengthen the offshore oil engineering construction project procurement schedule strategy,Improve engineering quality、reduce production cost.
作者
刘卓
Liu Zhuo(CNOOC Taizhou Petrochemical Co.,Ltd.,Jiangsu,225300)
出处
《当代化工研究》
2020年第4期22-23,共2页
Modern Chemical Research
关键词
海洋石油
工程建设项目
采购特点
进度管控
offshore oil
engineering construction project
procurement characteristics
progress control