期刊文献+

跨既有线钢结构天桥顶推施工方法 被引量:8

The Pushing Construction Method of Steel Structure Overbridge Overpassing Existing Railway
下载PDF
导出
摘要 随着我国高铁建设的飞速发展,部分老站需要进行扩能改造以满足使用需要,而扩能改造往往是在车站不停运的情况下进行的,给跨越多个站台的天桥施工带来很大的难度。论文以信阳站改扩建工程天桥施工为例,详细论述了跨既有线钢结构天桥顶推施工方法,希望为今后类似工程施工提供参考。 With the rapid development of China’s high-speed railway construction, some old stations need to be expanded and transformed to meet the needs of use, and the expansion and transformation is often carried out in the station without stopping operation, which brings great difficulty to the construction of the overbridge across multiple platforms. Taking the construction of the overbridge of Xinyang station reconstruction and expansion project as an example, this paper discusses in detail the pushing construction method of the steel structure overbridge overpassing the existing, hoping to provide references for similar projects in the future.
作者 柳辉 LIU Hui(China Railway Construction Industry Group Co.Ltd.,Beijing 100070,China)
出处 《工程建设与设计》 2020年第3期175-177,共3页 Construction & Design for Engineering
关键词 既有线 千斤顶 天桥顶推 施工方法 existing line jack overbridge pushing construction method
  • 相关文献

参考文献2

二级参考文献8

共引文献13

同被引文献54

引证文献8

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部