1Nag P K. Power Plant Engineering(Second Edition)[M]. Boston Mcgraw-Hill Companv, 2002.
2Astrom K J, Bell R D. Drum-boiler dynamics[J]. Automatica, 2000,36(3): 363-378.
3Khalil H K. Nonlinear Systems (Third Edition)[M]. NJ: Prentice Hall,2002.
4Dimeo R, Lee K Y. Boiler-turbine control system design using a genetic algorithm[J]. IEEE Transactions on Energy Conversion, 1995,10(4): 752-759.
5Rugh W J, Shamma J S. Research on gain scheduling[J]. Automatica,2000, 36(10): 1401-1425.
6Johansen T A, Hunt K J, Gawthrop P J. Off-equilibrium linearisation and design of gain-scheduled control with application to vehicle speed control[J]. Control Engineering Practice, 1998, 6(2): 167-180.
7Chan P, Shamma J S. Gain-scheduled l1 -optimal control for boilerturbine dynamics with actuator saturation[J]. Journal of Process Control, 2004, 14(3): 263-277.
8Feng Gang. Controller synthesis of fuzzy dynamic systems based on piecewise Lyapunov function[J]. IEEE Transactions on Fuzzy Systems,2003, 11(5): 605-612.
9Korba P, Babuska R. Fuzzy gain sehedualing: controller and observer design based on Lyapunov method and convex optimization[J]. IEEE Transactions on Fuzzy Systems, 2003, 11(3): 285-298.
10VanAntwerp J G, Braatz R D. A tutorial on linear and bilinear matrix inequalities[J]. Journal of Process Control, 2000, 10(4): 363-385.