高水头下闸门竖井衬砌结构计算研究 被引量:1

下载PDF
导出
摘要 从高水头下闸门井结构的实际受力出发,对围岩固结圈和外水折减两种计算思路进行计算分析,计算结果表明,两种计算方法变化规律一致,采用固结圈与衬砌共同承担井筒外水压力时,闸门井结构受力略大,但外水折减系数不能实际确定,考虑结构实际受力,围岩固结圈计算方法更加精确,符合工程实际。 Based on the actual force of the high-head gate structure,the calculations of the surrounding rock consolidation circle and the external water reduction are calculated.The calculation results show that the two calculation methods have the same regularity.When the rock consolidation circle and the lining jointly bear the outside water pressure,the structure of the gate well is stronger,but the external water reduction coefficient cannot be determined.Considering the actual force of the structure,the calculation method of the surrounding rock consolidation circle is more accurate and conforms to the engineering practice.
出处 《科学技术创新》 2020年第2期24-28,共5页 Scientific and Technological Innovation
基金 黔科合支撑项目([2017]2865) 中国电力建设股份有限公司科技项目经费资助 华能科技项目(HNKJ15-H12)
关键词 高水头 闸门井 围岩固结圈 摩尔-库伦模型 ABAQUS High-head Gate well Surrounding rock consolidation circle Moore-Coulomb model ABAQUS
  • 相关文献

参考文献2

二级参考文献3

  • 1郑晶星,黄立财,姚廉华.惠州抽水蓄能电站工程闸门井结构型式优化研究[J].水利规划与设计,2004(B04):57-60. 被引量:3
  • 2江克斌,屠一强,邵飞.结构分析仃限元原理及ANSYS实现[M].北京:国防工业出版社,2005.
  • 3广东省水利电力勘测设计研究院.广东省清远抽水蓄能电站可行性研究报告[R].广州:广东省水利电力勘测设计研究院,2007.

共引文献5

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部