摘要
龙首矿区绿化工程中有很多场地平整,土方回填和开挖工作。CASS用于设计场地平整计划并计算土方量。选择合理的土方调配计划尽量实现场地的填挖平衡。避免重复回填、开挖和运输,以达到优化场地平整设计和土方计算的最优解目的,以降低工程造价,提高工程效率,也为龙首矿区绿化设计方案提供设计依据。
In the greening project of Longshou Mining Area,many sites are leveled,earthwork backfilled and excavated.CASS is used to design site leveling plans and calculate earthwork.Choose a reasonable earthwork deployment plan to achieve the balance of filling and digging of the site as much as possible.Avoiding repeated backfilling,excavation and transportation,in order to achieve the optimal solution of site leveling design and earthwork calculation,in order to reduce project cost,improve project efficiency,and provide a design basis for the Longshou mining area greening design scheme.
作者
刘鹏山
张永龙
靳博
杨瑾皓
车山
甄震
丁科
LIU Peng-shan;ZHANG Yong-long;JIN Bo;YANG Jin-hao;CHE Shan;ZHEN Zhen;DING Ke(Jinchuan Group Co.,Ltd.Longshou Mine,Jinchang 737100,China)
出处
《世界有色金属》
2020年第1期154-155,共2页
World Nonferrous Metals