摘要
在进行地质工程勘查过程,所勘查的地区的周围环境相对复杂。在这种环境中进行地质桩基施工的地基工作,将会有一定的难度,容易导致钻头偏移,出现卡钻、漏浆等现象。文章针对此种现象进行分析与研究,以期为未来的工作作出有效应对措施。
In the process of geological engineering exploration,the exploration of the surrounding environment is relatively complex.In this kind of environment,it will be difficult to carry out the foundation work of geological pile foundation construction,which will easily lead to drill bit deviation,stuck,leakage and other phenomena.This paper analyzes and studies this phenomenon in order to make effective countermeasures for future work.
作者
魏巍
WEI Wei(Guizhou Nonferrous Geological Engineering Survey Company,Guiyang 550005,China)
出处
《世界有色金属》
2020年第1期241-241,243,共2页
World Nonferrous Metals
关键词
复杂地质
地质桩基
施工技术
Complex geology
Geological pile foundation
The construction technology