期刊文献+

An optimisation process to motivate effective adoption of BIM for refurbishment of complex buildings in New Zealand

原文传递
导出
摘要 Despite the multidisciplinary networks involved in refurbishment of complex building projects,the lack of BIM adoption signifies lack of real BIM benefits towards acceptance of BIM within Architecture,Engineering and Construction(AEC).To this end,this study empirically examines the potential real benefits between traditional network and BIM network for a real-time refurbishment case study project,through agentbased simulation modelling.A social network analysis theory is adapted to model the project interaction networks and a BIM prototype network.An assessment of the main stakeholders for BIM perception is carried out.We offered three prototype interaction networks for comparison of real BIM benefit.An agent-based Bayesian network model is used to simulate the propagation of design error within the project networks.The result of the analysis show that BIM project diffuses error efficiently,while stakeholders recovers faster and nearly at the same time than traditional network.The optimised network shows better performance to the traditional network,when there is early involvement of subcontractors.The main contribution of this study is providing a novel approach to compare real benefits for traditional method to BIM method for refurbishment project and to provide avenue for project stakeholders to optimise their interaction through adoption of BIM.
出处 《Frontiers of Architectural Research》 CSCD 2019年第4期646-661,共16页 建筑学研究前沿(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部