摘要 针对船舶曲面分段建造难度大、效率低的问题,对曲面分段车间建造作业调度过程进行仿真与优化研究。首先,提出基于虚拟流水线的分段建造车间作业调度模式;其次,基于数字化工厂策略实现其作业调度过程的仿真;以最大完工时间最小化为目标,提出基于遗传算法的作业调度过程优化;最后,以实际生产计划为对象进行了实例验证。结果表明:基于虚拟流水线的作业调度模式和基于数字化工厂策略的仿真优化,有效缩短了曲面分段建造周期,为提升船舶建造效率和水平提供了支撑。 In order to solve the difficulty and low efficiency in the construction of ship curve block,the simulation and optimization of curved block job shop scheduling is studied.Firstly,a job shop scheduling model based on virtual flow line is proposed.Secondly,the simulation and verification of the ship curve block job shop scheduling process are realized based on the strategy of digital factory.On this basis,the job scheduling process is optimized by genetic algorithm with the objective of minimize the makespan.Finally,an example of practical production planning for a shipyard is given.The results show that the scheduling model based on virtual flow line and the simulation optimization technology based on digital factory strategy can effectively shorten the period of the block construction.
作者 李磊 朱安慰 景旭文 周宏根 LI Lei;ZHU An-wei;JING Xu-wen;ZHOU Hong-gen(Jiangsu University of Science and Technology,Mechanical Engineering College,Jiangsu Zhenjiang212003,China)
出处 《机械设计与制造》 北大核心 2020年第2期141-144,共4页 Machinery Design & Manufacture
基金 某部委基础科研计划项目(JCKY2013414C001) 江苏省产学研合作项目(BY2016073-03)
关键词 曲面分段建造车间 虚拟流水线 数字化工厂 Curve Block Shop Virtual Flow Line Digital Factory
  • 相关文献

参考文献2

二级参考文献16

  • 1李波,王秀峰,赵志彦.一种基于遗传算法的最优空间布置方法[J].系统仿真学报,2004,16(8):1845-1848. 被引量:6
  • 2张志英,江志斌,陈强,孙嘉钧.曲面分段加工的虚拟流水线生产模式及关键技术探讨[J].中国造船,2005,46(3):112-116. 被引量:13
  • 3张璎,蒋祖华.船舶曲型分段生产计算机辅助工艺设计技术研究[J].计算机集成制造系统,2006,12(3):346-351. 被引量:4
  • 4鞠彦兵,王爱华,李桂芬.生产作业计划仿真优化研究[J].微计算机信息,2006,22(11X):4-6. 被引量:3
  • 5RAJ P,SRIVASTAVA R.Solving spatial scheduling problem:an analytical approach[C] //Proceeding of the 37th International Conference on Computers and Industrial Engineering.Cairo,Egypt:Cairo University Elearning Centre,2007:2002-2011.
  • 6MARTELLO S,PISINGER D,VIGO D.The three-dimensional bin packing problem[J].Operation Research,2000,48(2):256-267.
  • 7FAINA L.A global optimization algorithm for the three-dimensional packing problem[J].European Journal of Operational Research,2000,126(2):340-354.
  • 8CRAINIC T,PERBOLI G,TADEI R.Extreme point-based heuristics for three-dimensional bin packing[J].INFORM Journal on Computing,2008,20(3):368-384.
  • 9CRAINIC T,PERBOLI G,TADEI R.TS2PACK:a two-level tabu serch for the three-dimensional bin packing problem[J].European Journal of Operational Research,2009,195(3):744-760.
  • 10LEE K J,LEE J K,CHOI S Y.A spatial scheduling system and its application to shipbuildings DAS-CURVE[J].Expert System with Application,1996,10(3/4):311-324.