摘要 在高围压条件下,把改性黏土混合浆液灌注入受损地质体已成为应用最为广泛的注浆方法之一,但因高围压排水条件下浆液初凝时间测试方法的缺失,混合浆液初凝时间研究较为困难,因此通过自主研发的浆液固结试验平台,对高围压条件下改性黏土混合浆液初凝时间进行了相关研究,以指导现场生产。 Infusing modified clay mixed slurry into geological damage under high confining pressure has become one of the most widely used grouting methods.But due to the lack of initial setting time testing method under the high confining pressure and drainage conditions,to study on the mixed slurry initial setting time is difficult.The initial setting time of modified clay mixed slurry under high confining pressure was studied through the self-developed slurry consolidation test platform,so as to guide the field production.
作者 薛晓峰 XUE Xiaofeng(North China Nonferrous Engineering Investigation Institute Co.,Ltd.,Shijiazhuang 050021,China)
出处 《中国矿业》 北大核心 2020年第3期167-170,共4页 China Mining Magazine
基金 国家自然科学基金面上项目资助(编号:51374203)
关键词 高围压 浆液固结试验平台 改性黏土混合浆液 初凝时间 high confining pressure slurry consolidation test platform modified clay mixed slurry initial setting time
  • 相关文献

参考文献4

二级参考文献6

  • 1杨秀竹,王星华,雷金山.宾汉体浆液扩散半径的研究及应用[J].水利学报,2004,35(6):75-79. 被引量:91
  • 2曾祥熹.泥浆流变学与粘度测量[M].湖南:湖南地质学会,1981.161-170.
  • 3岩土注浆理论与工程实例协作组.岩土注浆理论与工程实例[M].北京:科学出版社,2001..
  • 4地基处理委员会.地基处理手册[M].北京:中国建筑工业出版社,1993..
  • 5GBT50123-1999[S].土工试验方法标准.[S].,..
  • 6吴秀美.改性粘土浆的试验研究[J].矿业研究与开发,2002,22(4):36-37. 被引量:19