摘要
在高围压条件下,把改性黏土混合浆液灌注入受损地质体已成为应用最为广泛的注浆方法之一,但因高围压排水条件下浆液初凝时间测试方法的缺失,混合浆液初凝时间研究较为困难,因此通过自主研发的浆液固结试验平台,对高围压条件下改性黏土混合浆液初凝时间进行了相关研究,以指导现场生产。
Infusing modified clay mixed slurry into geological damage under high confining pressure has become one of the most widely used grouting methods.But due to the lack of initial setting time testing method under the high confining pressure and drainage conditions,to study on the mixed slurry initial setting time is difficult.The initial setting time of modified clay mixed slurry under high confining pressure was studied through the self-developed slurry consolidation test platform,so as to guide the field production.
作者
薛晓峰
XUE Xiaofeng(North China Nonferrous Engineering Investigation Institute Co.,Ltd.,Shijiazhuang 050021,China)
出处
《中国矿业》
北大核心
2020年第3期167-170,共4页
China Mining Magazine
基金
国家自然科学基金面上项目资助(编号:51374203)
关键词
高围压
浆液固结试验平台
改性黏土混合浆液
初凝时间
high confining pressure
slurry consolidation test platform
modified clay mixed slurry
initial setting time