期刊文献+

基于CAS优化的LSTM循环神经网络的高压断路器故障预测方法研究 被引量:4

Fault Prediction Research of High Voltage Circuit Breakers Based on LSTM Recurrent Neural Network Optimized by CAS
下载PDF
导出
摘要 在研究真空高压断路器运行历史数据的基础上,提出一种基于长短期记忆(LSTM)循环神经网络的断路器故障时间序列预测方法,采用混沌蚁群(chaotic ant swarm,CAS)优化算法训练LSTM模型,并在TensorFlow深度学习框架上搭建模型仿真,与其他常用的优化训练方法相比,基于CAS优化的LSTM模型具有更高的预测精度和更短的训练步数,且模型简单容易训练。该故障预测方法在基于时间序列的设备故障预测方面有较高的应用价值。 On the basis of studying the operation history data of vacuum high voltage circuit breaker,this paper proposes a fault time series prediction method based on Long Short-Term Memory( LSTM)Recurrent neural network. The LSTM model is trained by Chaotic Ant Swarm( CAS) optimization algorithm,and the model is built on the TensorFlow deep learning framework. Compared with other commonly used optimization training methods,LSTM model based on CAS optimization has higher prediction accuracy and shorter training steps,and the model is simple and easy to train. This method is an effective fault prediction method,and has high application value in equipment fault prediction based on time series.
作者 张莲 王磊 曹阳 ZHANG Lian;WANG Lei;CAO Yang(School of Electrical and Electronic Engineering,Chongqing University of Technology,Chongqing 400054,China;State Grid Shanxi Overhaul Company)
出处 《重庆理工大学学报(自然科学)》 CAS 北大核心 2020年第2期181-187,共7页 Journal of Chongqing University of Technology:Natural Science
基金 国家自然科学基金项目(61402063)
关键词 高压断路器 故障预测 CAS 时间序列 LSTM TensorFlow high voltage circuit breaker fault prediction chaotic ant swarm time series LSTM tensorFlow
  • 相关文献

参考文献3

二级参考文献26

  • 1薛子云,杨江天,朱衡君.机械故障预测模型综述[J].机械强度,2006,28(z1):60-65. 被引量:26
  • 2胡小兵,黄席樾.蚁群优化算法及其应用[J].计算机仿真,2004,21(5):81-85. 被引量:31
  • 3董晟飞,马秀红.基于回归分析的故障率预测模型[J].国外电子测量技术,2005,24(5):28-29. 被引量:17
  • 4祝耀昌.可靠性故障物理技术及其应用[J].装备环境工程,2005,2(2):28-33. 被引量:20
  • 5Michael J C, David E M, Thomas J S, et al. Comparison of elec- tronics reliability assessment approaches[J].IEEE Transactions on Reliability, 1993, 42(4) : 542 - 546.
  • 6Telcordia SR 332 Documentation Information. Reliability prediction procedure for electronic equipment[S].Telcordia, 2006:1 -98.
  • 7David Dylis D. PRISM : a new approach to reliability prediction [J].ASQ, Reliability Review, 2001, 21(1) : 5 - 14.
  • 8FIDES Guide (Issue A). Reliability methodology for electronic systems[S]. FIDES Group, 2004:1 - 347.
  • 9Pecht M. Why the traditional reliability prediction models do not work-is there an alternative? [J].Electronic Cooling, 1996, 2 (1): 10-12.
  • 10Pecht M, Dasgupta A. Physics of failure: an approach to reliable product development [A]. Integrated Reliability Workshop, Final Report., International, 1995:1-4.

共引文献427

同被引文献51

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部