期刊文献+

高速动车组转向架数据智能采集与实施方法 被引量:3

Intelligent Collection and Implementation Method for the Bogie Data of High Speed Railway EMU
下载PDF
导出
摘要 概述转向架数字化工厂三大系统总体架构,通过结构化部署,优化设备配置,完成关键工序、特殊过程的数据采集;实现QMS系统与智能监造系统信息实时同步、共享,实现了转向架生产过程的智能化检测监测,有效完成了智能设备数据的整合。 The paper overviews the overall architecture of the three systems of bogie digital factory,which implements the data collection of critical and special process through structuring and optimizing the device layout,materializes the real-time synchronization and information sharing between QMS system and intelligent manufacture monitoring system,as well as the intelligent inspection and monitoring during the production of the bogie,effectively completing the integration of intelligent device data.
作者 赵晓春 陈晓亮 赵志春 贾广跃 姚迪 ZHAO Xiaochun;CHEN Xiaoliang;ZHAO Zhichun;JIA Guangyue;YAO Di(China Railway Ji'nan Group Co Ltd,Ji'nan Shandong 250001,China;CRRC Qingdao Sifang Co Ltd,Qingdao Shandong 266111,China)
出处 《中国铁路》 2020年第2期102-109,共8页 China Railway
基金 中国铁路济南局集团有限公司科技研究开发计划项目(SF/xx-2019-005)
关键词 动车组 转向架 信息采集 监造 EMU bogie information collection manufacture monitoring
  • 相关文献

参考文献10

二级参考文献18

共引文献182

同被引文献17

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部