摘要
本文结合尼日利亚拉各斯莱基地区DangoteSPM海工项目桩基设计与施工经验,对该地区钢管桩设计施工的停锤标准问题进行初步探讨,供类似工程参考。
Based on the design and construction experience in pile foundation of Dangote SPM marine project in Lekki, Lagos, Nigeria, a preliminary study has been carried out for final criteria for driving steel pipe piles in the area, which will provide a reference for similar projects.
作者
王馨
窦峰
唐明刚
Wang Xin;Dou Feng;Tang Minggang(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou Guangdong 510000,China;The Third Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Zhanjiang Guangdong 524005,China)
出处
《港工技术》
2020年第1期104-107,共4页
Port Engineering Technology
关键词
钢管桩
停锤标准
锤击能量
贯入度
承载力
steel pipe pile
final criteria of pile driving
hammer energy
penetration
bearing capacity