期刊文献+

±800 kV天中直流工程运行故障及风险因素分析

Analysis of Operation Faults and Risk Factors of ±800kV Tianzhong DC Project
下载PDF
导出
摘要 针对±800 kV天中直流工程投运后,河南电网逐步向受端电网转变,进入交直流混合运行状态,从受端电网安全稳定性来开展±800 kV天中直流工程运行故障及风险因素的分析。 After the±800 kV Tianzhong DC project is put into operation,the Henan power grid gradually shifts to the receiving-end power grid and enter the AC-DC hybrid operation state.The analysis of operation faults and risk factors of±800 kV Tianzhong DC project is carried out based on the safety and stability of the receiving-end power grid.
作者 刘博 张宇鹏 李东亚 李媛 陈钊 李明洋 LIU Bo;ZHANG Yupeng;LI Dongya;LI Yuan;CHEN Zhao;LI Mingyang(Electric Power Research Institute of State Grid Henan Electric Power Co.,Ltd.,Zhengzhou 450052,China;Henan Jiuyu Enpai Power Technology Co.,Ltd.,Zhengzhou 450052,China)
出处 《电工技术》 2020年第3期88-90,92,共4页 Electric Engineering
关键词 天中直流工程 外绝缘闪络 降压运行 舞动区域 冰害 污秽等级 Tianzhong DC project external insulation flashover step-down operation galloping area ice damage pollution level
  • 相关文献

参考文献13

二级参考文献235

共引文献909

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部