摘要
针对±800 kV天中直流工程投运后,河南电网逐步向受端电网转变,进入交直流混合运行状态,从受端电网安全稳定性来开展±800 kV天中直流工程运行故障及风险因素的分析。
After the±800 kV Tianzhong DC project is put into operation,the Henan power grid gradually shifts to the receiving-end power grid and enter the AC-DC hybrid operation state.The analysis of operation faults and risk factors of±800 kV Tianzhong DC project is carried out based on the safety and stability of the receiving-end power grid.
作者
刘博
张宇鹏
李东亚
李媛
陈钊
李明洋
LIU Bo;ZHANG Yupeng;LI Dongya;LI Yuan;CHEN Zhao;LI Mingyang(Electric Power Research Institute of State Grid Henan Electric Power Co.,Ltd.,Zhengzhou 450052,China;Henan Jiuyu Enpai Power Technology Co.,Ltd.,Zhengzhou 450052,China)
出处
《电工技术》
2020年第3期88-90,92,共4页
Electric Engineering
关键词
天中直流工程
外绝缘闪络
降压运行
舞动区域
冰害
污秽等级
Tianzhong DC project
external insulation flashover
step-down operation
galloping area
ice damage
pollution level