摘要
核电站预装设备是指后期没有正常引入通道,必须在工程建设土建施工阶段引入就位的设备。预装设备的引入工作必须综合考虑设计、供货、土建和总平等各方面先决条件,以及各种不可控的风险。按计划引入预装设备,能够很大程度上促进核电站工程建设的顺利开展。本文主要通过对核电站预装设备引入工作管理难点进行剖析,总结工作中的经验,创新性的提出具有通用价值的控制管理措施,消除或减小各方面不利因素对于现场施工管理的影响,助力核电总承包单位进行管理提升。
Pre-assembled equipment for nuclear power refers to the which hant normal introduc channel at the later stage be positioned during this construction period.All preconditions of design,supply,construction,general layout as well as uncontrolled risks should be taken into consideration for the introduction work.Smooth progress for construction of nuclear power station will be achieved if introduction schedule is to be followed.And this article analyzes the difficult issues equipment introduction,summar work experience.In this connection,universal but new control and management methods have been brought forward to mitigate the unfavorable factors of construction management on site and lp the management.
作者
丁嘉伟
DING Jia-wei(China Nuclear Power Engineering Co.,Ltd.,Beijing 100840,China)
出处
《中国核电》
2019年第6期679-682,共4页
China Nuclear Power