以石黔高速连续刚构连湖大桥实际工程为例,对三角挂篮结构、反作用力预压方法,以及挂篮预压施工中注意事项进行了阐述。
Taking the actual project of Shiqian highspeed continuous rigid frame Lianhu bridge as an example,this paper expounds the triangular traveling basket structure,the method of reaction force preloading and the matters needing attention in the construction of traveling basket preloading.
作者
刘洋
LIU Yang(China Railway 20th Bureau Group Fourth Engineering Co.,Ltd.,Shandong Qingdao 266100 China)
关键词
三角挂篮
结构
预压
注意事项
triangular hanging basket
structure
preloading
matters needing attention