摘要
以迪拜卡普特项目为例,阐述了多形式液压爬模技术的应用,在该项目的具体施工中,经过计算机有限元计算分析,多形式液压爬模技术的应用,使其架体结构有效满足了各种工况承载力和不同核心筒结构形状的要求。有效解决了施工中钢板剪力墙、大尺寸伸臂桁架及高层大的施工难度,值得其他类似工程大力参考借鉴。
Based on the specific case of Kaput project in Dubai,the multi-form hydraulic climbing formwork technology is introduced.By computer finite element calculation and analysis,the frame structure effectively meets the requirements of bearing capacity under various working conditions and different core tube structure shapes.The technology can effectively solve the construction difficulties of steel plate shear wall,large-scale boom truss and high-rise building,and it can work as reference for other similar projects.
作者
高凯飞
GAO Kai-fei(International Corporation of CR18G,Tianjin 300350,China)
出处
《浙江水利水电学院学报》
2020年第1期63-67,86,共6页
Journal of Zhejiang University of Water Resources and Electric Power
关键词
多形式
液压爬模
企业大厦
有限元
multiform
hydraulic climbing formwork
enterprise building
finite element