摘要
研究了CTCS-2级列控系统反向运行的相关规范及修订过程,分析了信号系统动态检测中发现的反向运行相关问题,并提出了解决方案,可为线路信号系统的设计提供参考。
Related specifications on reverse operation of the CTCS-2 train control system and the revision process of those specifications are studied.Hereinto,related problems of reverse operation found in dynamic test of the signal system are analyzed and solutions are given,offering references for the design of the signal system.
作者
徐效宁
肖兴
何镭强
牛勤
Xu Xiaoning;Xiao Xing;He Leiqiang;Niu Qin
出处
《铁道通信信号》
2020年第1期1-3,共3页
Railway Signalling & Communication