期刊文献+

高层民用建筑改造工程电气设计的应对策略 被引量:4

Countermeasures for Electrical Design of the High-rise Civil Building Reconstruction Project
下载PDF
导出
摘要 分析民用建筑改造工程需要综合考虑的因素,提出PDCA应对策略,以高层民用建筑为对象,结合实际工程案例,针对变配电系统的改造,详细论述如何通过PDCA逐步得出合理可行的方案。 The integrated factors to be considered in the civil building reconstruction project are analyzed and the PDCA countermeasures are put forward;taking the high⁃rise civil building as the object and combined with the actual engineering case,the method that a reasonable and feasible scheme is established through PDCA for the reconstruction of power transformation and distribution system is elaborated.
作者 吴学娟 刘冰 WU Xuejuan;LIU Bing(CITIC General Institute of Architectural Design and Research Co.,Ltd.,Wuhan 430014,China)
出处 《建筑电气》 2020年第3期19-22,共4页 Building Electricity
关键词 高层民用建筑 变配电系统 改造工程 PDCA 备用电源 土建条件 机电设备 外部环境 high⁃rise civil building power transformation and distribution system reconstruction project PDCA standby electrical source civil condition electronmechanical equipment external environment
  • 相关文献

参考文献1

二级参考文献5

  • 1北京市建筑设计研究院.JGJ31-2003体育建筑设计规范[S].北京:中国建筑工业出版社,2003
  • 2中国建筑东北设计研究院,JGJ16-2008民用建筑电气设计规范[S].北京:中国建筑工业出版社,2008.
  • 3中国联合工程公司.GB50052-2009供配电系统设计规范[S].北京:中国计划出版社,2010.
  • 4第16届亚洲运动会组织委员会.第16届亚洲运动会竞赛场地和器材技术要求与标准[S],2008.
  • 5冯家禄,周名嘉,主编.第16届亚运会亚运场馆供配电设计导则(试行稿)[S],2009.

共引文献1

同被引文献13

引证文献4

二级引证文献2

相关作者