分析民用建筑改造工程需要综合考虑的因素,提出PDCA应对策略,以高层民用建筑为对象,结合实际工程案例,针对变配电系统的改造,详细论述如何通过PDCA逐步得出合理可行的方案。
The integrated factors to be considered in the civil building reconstruction project are analyzed and the PDCA countermeasures are put forward;taking the high⁃rise civil building as the object and combined with the actual engineering case,the method that a reasonable and feasible scheme is established through PDCA for the reconstruction of power transformation and distribution system is elaborated.