低温天气下微表处施工出现固结速度偏慢的问题。为保证微表处施工质量,通过室内试验并结合实际工程,提出低温天气下微表处施工解决措施。
The problem of slower consolidation rate of micro-surfacing construction happens in low temperature.Through the laboratory tests and combined with the practical project,this paper puts forward the countermeasures for the micro-surfacing construction in low temperature.