重庆西站施工及预应力关键技术 被引量:3

Construction and Prestress Key Technology of Chongqing West Railway Station
下载PDF
导出
摘要 重庆西站主体结构为混凝土结构,上部结构为钢结构。站房屋盖主结构采用正交空间管桁架结构体系,跨度大、矢高高;无站台柱雨篷位于高架站房南北两侧对称布置,采用清水预应力混凝土结构。基于本工程结构施工难度大、安装困难、施工组织管理难度高的特点,详细介绍其施工组织部署及预应力关键技术等。 The main structure of Chongqing West Railway Station is concrete structure and the superstructure is steel structure.The main structure of the station building is orthogonal space tube truss system with large span and high vector.Awning without column is arranged symmetrically on the north and south sides of the elevated station house.Based on the characteristics of the construction difficulty,installation difficulty and construction organization and management difficulty of this project structure,this paper introduces the construction organization and deployment and key construction technologies of prestress in detail.
作者 李宁 董洁 LI Ning;DONG Jie(School of Civil Engineering,Tianjin University,Tianjin 300072,China;Key Laboratory of Coast Civil Engineering Structures Safety,Ministry of Education,Tianjin 300350,China;Key Laboratory of Earthquake Engineering Simulation and Seismic Resilience of China Earthquake Administration(Tianjin University),Tianjin 300350,China;Shanxi Sijian Group Co.,Ltd.,Taiyuan,Shanxi 030012,China)
出处 《施工技术》 CAS 2020年第2期34-39,共6页 Construction Technology
基金 国家重点研发计划(2018YFC1504306,2016YFC0701108) 国家自然科学基金面上项目(51678407)。
关键词 高铁站 站房 混凝土 安装 施工组织 预应力 施工技术 high-speed railway station station building concrete installation construction organization prestress construction
  • 相关文献

参考文献5

二级参考文献13

共引文献21

同被引文献11

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部