期刊文献+

明挖隧道施工对邻近高层建筑和施工环境影响研究 被引量:2

Study on the Influence of Open Cut Tunnel Construction on Adjacent High-rise Buildings and Construction Environment
下载PDF
导出
摘要 以新苔井山隧道右线明挖段邻近小区高层建筑为背景,选定模型、边界条件、材料参数与荷载后,通过FLAC3D模拟明挖隧道邻近高层建筑的施工过程,主要对围护结构、地表沉降、建筑沉降、基坑底部隆起等进行系统分析,并对比结果与现场监测数据。结果表明:围护结构变形属复合型变形,最大水平位移为23.32mm;地表沉降为动态变化过程,无建筑侧沉降变形形式符合正态函数;建筑距离基坑距离越小,沉降值越大,反之越小,最大沉降值为5.39mm;底板施作对基坑隆起有很好的抑制作用,整体变形表现为M形,周边土体整体变形趋势都是向应力缺失的方向。 Taking the open cut section of the right line of the new Taijingshan tunnel near the high rise residential building as the background,the construction process of open cut tunnel near high-rise building is simulated by FLAC3D.Mainly on the retaining structure,ground settlement,building settlement,foundation excavation bottom uplift and other systems are analyzed,and the results are compared with the field monitoring data.The result shows that,the deformation of the retaining structure is a composite deformation,and the maximum horizontal displacement is 23.32mm.Ground settlement is a dynamic process,and no building side settlement deformation is in line with normal function.The smaller the distance between the building and the foundation pit,the larger the settlement value,and vice versa,the smaller the maximum settlement value is-5.39mm.The construction of the floor has a good inhibition effect on the uplift of the foundation excavation.The overall deformation is M-shaped.The overall deformation trend of the surrounding soil is in the direction of stress loss.
作者 张晓荣 陈志敏 朱烜 文勇 黄文祥 ZHANG Xiaorong;CHEN Zhimin;ZHU Xuan;WEN Yong;HUANG Wenxiang(Key Laboratory of Road&Bridge and Underground Engineering of Gansu Province,Lanzhou Jiaotong University,Lanzhou,Gansu 730070,China;National and Provincial Joint Engineering Laboratory of Road&Bridge Disaster Prevention and Control,Lanzhou Jiaotong University,Lanzhou,Gansu 730070,China;China Railway Taiyuan Group Co.,Ltd.,Taiyuan,Shanxi 030009,China;Gangzhou Metro Group Co.,Ltd.,Guangzhou,Guangdong 510335,China)
出处 《施工技术》 CAS 2019年第24期49-54,109,共7页 Construction Technology
基金 国家自然科学基金资助项目(11662007) 长江学者和创新团队发展计划滚动资助(IRT_15R29)。
关键词 隧道 邻近建筑 数值模拟 沉降 监测 tunnels near building simulation settlement monitoring