摘要
本文以广州某酒店为例,通过分析其空调负荷及生活热水负荷关系,确定两种热回收方案的详细机组配置。并对其在技术方面和热回收经济性方面进行分析,最终确定采用水水热泵全热回收方案为最优方案。
This paper takes a hotel in Guangzhou as an example to determine the detailed unit configuration of two heat recovery schemes by analyzing the relationship between air conditioning load and domestic hot water load.In addition,the technical and economic aspects of heat recovery were analyzed,and the water-water heat pump total heat recovery scheme was finally determined to be the optimal scheme.
作者
张美玲
沈洪
ZHANG Meiling;SHEN Hong(The Architectural Design&Research Institute of Guangdong Province,Guangzhou 510010)
出处
《制冷》
2019年第4期25-29,共5页
Refrigeration
关键词
酒店建筑
全热回收机组
部分热回收机组
经济性分析
Hotel Building
Full Heat Recovery Unit
Partial Heat Recovery Unit
Economic Analysis