期刊文献+

基于ISM和ANP的装配式建筑施工进度影响因素研究 被引量:3

Study on influencing factors of prefabricated building construction schedule based on ISM and ANP
下载PDF
导出
摘要 装配式建筑虽然从理论上可以大幅度缩短建造工期,但是由于多种原因,一般很难达到预期的效果。装配式建筑从设计到装配四个阶段影响进度的因素众多,并且因素之间存在着复杂的关系。通过文献梳理与专家访谈的结果确定了15个主要的影响装配式建筑施工进度的指标,并利用解释结构模型(ISM)的方法将指标要素之间的关系转化为可达矩阵,建立装配式建筑施工进度的ISM模型,揭示出各要素之间的相互关系,然后运用网络层次分析法(ANP)求解出各影响因素的权重,进而找出影响装配式建筑进度的主要因素。 Although prefabricated construction buildings(PCBs)can greatly shorten the construction period theoretically,it is difficult to achieve the expected effect due to various reasons.There are many factors influencing the progress of PCBs from design to assembly,and there are complex relations among them.Through literature review and expert interview results,15 main indicators affecting the construction progress of PCBs are determined.The relationship between index elements is transformed into accessible matrix by using the method of Interpretative Structure Model(ISM),the PCBs construction progress of the ISM,reveals the relationship between each factor and then use the analytic network process(ANP)and then find out the main factors that affect the progress of PCBs.
作者 高魁 GAO Kui(School of Management,Hefei University of Technology,Hefei 230009,China)
出处 《安徽建筑大学学报》 2019年第6期56-64,共9页 Journal of Anhui Jianzhu University
关键词 装配式建筑 进度影响因素 ISM ANP prefabricated construction buildings Schedule influencing factors ISM ANP
  • 相关文献

参考文献3

二级参考文献24

共引文献21

同被引文献37

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部