六跨式电分相施工技术调整思路

Adjustment Thinking of Construction Technology for Six-span Phase Break
下载PDF
导出
摘要 我国的电气化铁道接触网通常采用的锚段式电分相有六跨式,七跨式、八跨式等几种,目前国内的客专、高铁大多采用六跨式电分相,通过汉宜、石武、集包、大西等几个项目的电分相施工,总结出了提高工作效率的的施工方法,在实际工程中取得了较好效果。本文主要介绍在施工过程中对六跨式电分相非工作支抬高的计算调整方法,从而将电分相的施工调整量达到最低,实现一次调整到位。 The six-span, seven-span, and eight-span overlap phase break for overhead contact system adopted in electrified railway,and six-span overlap phase break is mostly adopted in the current passenger dedicated and high-speed railway in China. After the construction of several projects, such as Hankou-Yichang, Shijiazhuang-Wuhan, Jining-Baotou, and Datong-Xi’an, the construction method summarized in this paper improves the effficiency in practical construction. This paper mainly introduces the calculation adjustment method for the six-span phase break of non-working wire elevation in construction, which reduces the construction adjustment of phase break and make the devices of phase break in place and good performance after one adjustment.
作者 樊桃 FAN Tao(China Railway Construction Electrification Bureau Group Co.,Ltd.,Beijing 100043,China)
出处 《价值工程》 2020年第6期147-149,共3页 Value Engineering
基金 中国铁建电气化局集团科技研发计划项目(2015-005)。
关键词 六跨式电分相 锚段关节 无电区 非工作支 悬挂调整 six-span overlap phase break overlap neutral section non-working wire catenary suspension adjustment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部