托架法在盖梁施工中的应用 被引量:3

Application of Bracket Method in Covered Beam Construction
下载PDF
导出
摘要 墩身盖梁以往一般采用搭设满堂托架施工。我单位施工某高铁车站到发线,由于施工工期紧,地基处理成本大,且墩身高度较高,满堂托架不能满足施工工期要求,同时施工成本过高。经过验算,在施工中采用在墩身施工时预埋钢棒在钢棒上制作托架施工盖梁。通过实践,取得较好的效果,达到施工安全、快捷,保证工程质量的要求。 In the past, the pier body covered beams were generally constructed with full-house brackets. In the construction of the arrival line of a high-speed railway station by my unit, due to the tight construction period, high foundation treatment cost, and high pier height, the full-house bracket cannot meet the construction period requirements, and the construction cost is too high. After checking and calculating, in the construction, the embedded steel rod is used to make the bracket construction cover beam on the steel rod during the pier construction. Through practice, good results have been achieved, which meets the requirements for safe and fast construction and guaranteed project quality.
作者 赵亮 ZHAO Liang(The 3rd Engineering Co.,Ltd.of China Railway 17 Bureau Group Corporation,Shijiazhuang 050000,China)
出处 《价值工程》 2020年第6期194-195,共2页 Value Engineering
关键词 墩身盖梁 施工技术 托架 pier body covered beam construction technology bracket
  • 相关文献

参考文献2

二级参考文献9

共引文献13

同被引文献15

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部