期刊文献+

页岩气开发中连续油管管体失效的原因分析及对策

Cause Analysis and Countermeasures of Coiled Tubing Failure in Shale Gas Development
下载PDF
导出
摘要 在页岩气开发中,连续油管的应用迅速普及。然而,连续油管在页岩气开发与在常规油气井开发中的工艺及工况均存在显著差异,导致两者失效原因明显不同,故连续油管管体失效始终是页岩气开发中面临的一个重要难题。连续油管失效是直接影响连续油管作业成本以及作业安全的主要因素,因此寻找连续油管在页岩气开发中管体失效的原因和采取有效预防措施显得十分重要和迫切。管体失效的有效解决可为连续油管在页岩气开发中的安全性能评估提供重要依据,明显提高连续油管服役寿命和增加经济效益。 Coiled tubing is more and more widely used in the development of shale gas.However,due to the significant differences in the process and working conditions of coiled tubing between shale gas development and conventional oil and gas development,the fail⁃ure causes of coiled tubing are different.The failure of coiled tubing is always an important problem in shale gas development.Coiled tubing failure directly affects the cost and safety of coiled tubing operation.This paper analyzes the causes of the failure of coiled tub⁃ing in shale gas development,and gives the corresponding effective preventive measures,which can provide an important basis for the safety performance evaluation of coiled tubing,improve the service life of coiled tubing,and increase economic benefits.
作者 方福君 蒋涛 王国峰 田军 张晓亮 谭文波 邹先雄 Fang Fujun;Jiang Tao;Wang Guofeng;Tian Jun;Zhang Xiaoliang;Tan Wenbo;Zou Xianxiong(Downhole Operation Company,PetroChina Chuanqing Drilling Engineering Co.,Ltd.,Chengdu 610213,Sichuan,China;Changqing Downhole Technology Operation Company,PetroChina Chuanqing Drilling Engineering Co.,Ltd.,Xianyang 712000,Shaanxi,China;Oil Testing Company,CNPC Xibo Drilling Engineering Company Limited,Karamay 834000,Xinjiang,China;Downhole Operation Company,PetroChina Chuanqing Drilling Engineering Co.,Ltd.,Chengdu 610052,Sichuan,China)
出处 《石油工业技术监督》 2020年第2期54-57,共4页 Technology Supervision in Petroleum Industry
基金 中国石油集团公司一线生产难题“连续油管在页岩气开发中管体失效原因及对策”(编号:2019-033)
关键词 连续油管 管体失效 页岩气 coiled tubing tubing failure shale gas
  • 相关文献

参考文献3

二级参考文献22

  • 1Brown P A, Dickerson J L. Development and use of an analytical model to predict coiled tubing diameter growth [ R]. SPE 38409, 1997.
  • 2Radovan R, Steven M T. Muhiaxial cyclic ratcheting in coiled tubing -part Ⅱ: experimental program and model evaluation [J]. ASTM, 2000, 12: 166-167.
  • 3Steven M T. Coiled -tubing deformation mechanics: diametral growth and elongation [ R ]. SPE 50966, 1998.
  • 4APIRP 5C7 1996. Coiled tubing operations in oil and gas well services [S]. 1996.
  • 5Newman K. Coiled tubing technology continues its rapid growth. World Oil, 1998, 219 (1) : 64 -70
  • 6NETL U S. Department of Energy. , Coiled Tubing: State of the Industry and Role for NETL June, 2005
  • 7Maldonado J G. Pitting, Tensile Overloading Produce Most Coiled- tubing Failures. Oil & Gas Journal, 2000, 98 (26) : 48 -54
  • 8Adrichem W P. Coiled Tubing Failure Statistics Used to Develop Tubing Performance Indicators, SPE/ICoTA Coiled Tubing Roundtable, 25- 26 May, 1999, Houston, Texas, USA. SPE54478
  • 9Adrichem W P. Coiled- Tubing Failure Statistics Used To Develop CT Performance Indicators. SPE Drilling & Completion, 2002, 17 (3) : 159 - 163
  • 10Afghoul A C. Coiled Tubing: The Next Generation, Oilfield Review, 2004, (1): 38-57

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部